Anticipated work items over the next month includes (but is not limited to) the following: Excavation for new storm line under the football field. ICT provided MPE and FP services for the demolition, new construction, and renovation of the Hillsboro High School Campus located in the heart of Green Hills. Education > General Building > Middle/Senior High School. We are scheduled to complete Phase 2 in mid-June 2020. Project details. The fundamental design elements for the project consisted of energy efficiency, ease of maintenance, sustainability, and compliance with the latest MNPS design standards. West side – Re-establish subgrade/proof roll, 1st lift base stone, curb & gutter, base stone/ binder, site concrete. Coordinate with the TDOT mill & overlay work being performed in Hillsboro Pike. This is a safety issue and will be strictly enforced. – photo by David Smith The $89 million renovation of Hillsboro High School’s 28-acre campus officially began with a groundbreaking ceremony last week on the lawn in front of the school. The project is in review for permitting. Overall, the project is still on schedule and within budget. The Aquatic Resource Alteration Permit NRS 17.222-Hillsboro High School has been received from the State of Tennessee Dept. Construction updates will be posted here as we get them. Parents will enter the site from Glen Echo. The preliminary renovation expands that to 1,600. The Hillsboro HS – Addition & Renovation project continues to progress. The traffic signal design work at the new school entry off Hillsboro Pike is complete. The Hillsboro HS – Addition & Renovation project continues to progress, and we are still scheduled to complete Phase 2 in mid-June 2020. Anticipated work items over the next month includes the following: Assist staff, students, and parents to navigate safely around the construction barriers and fencing in order to keep everyone on site safe during the Phase 1 demolition work. Hillwood High School Replacement School. Visitors and students being dropped off during these hours should use the old car rider drop-off/pickup lane/parking lot on the south side of campus. Phase 3 appears to be progressing very well. All traffic had to be moved to the south side of the site to accommodate new site work on the north side of the site. The contractor’s construction offices are established on site. Once that process is complete, demolition can begin. The preliminary renovation expands that to 1,600. The following work is anticipated over the next month: The Hillsboro HS – Addition & Renovation project continues to progress! The foundation work for the precast parking structure is close to completion. Once again, we thank all students, staff, and parents for their teamwork. The contractor will celebrate the topping out of the Phase 1 addition with a party on October 5, 2018. This work is not planned to begin until after Thanksgiving and Christmas seasons. Temporary student parking areas have been established as well. Hillsboro High School celebrated the start of a renovation and addition project with a groundbreaking ceremony on Aug. 23. Confirm with TDOT if new mill & overlay is required. We continue to thank all students, staff, and parents for their teamwork. Fulfilling the 2017 bond promise for the future of Hillsboro's students. We continue to thank all students, staff, and parents for their teamwork. Stage curtains await installation. The cost to renovate Hillsboro High School has ballooned far over the budgeted almost $89 million amount for the project. – We have a new loop on the north side of the campus that is accessed at the light off of Hillsboro Road for accessible buses with specialized ramps for wheelchairs, and for parents of students who have accessibility needs. The Hillsboro HS – Addition & Renovation project is currently in Phase 3. Coordination meetings between the general contractor, Stansell Electric, WeGo, and MNPS occur weekly. The Phase 2 Renovation work is still the primary focus for construction. Construction offices have moved to the old softball field, which is being used as a staging area for supplies while the football field is being re-graded and reconstructed. Students are only allowed to park in the designated parking lots. The students riding a school bus will enter the new addition front entrance facing Hillsboro Pike. 2) Provided a tour of the Phase 1 addition to the Alliance for Green Hills. The removal of surplus furniture by MNPS Distribution, removal of kitchen equipment by Nutritional Services, removal and staging of teachers boxes, moving the band classroom into the Global Annex, removing and storing theatre equipment, and moving football facilities into the former wrestling building has been coordinated and is complete. The site work that will connect the new vehicular entrance at Hillsboro Pike continues to progress as well. Only six spaces are available per tour and you must sign up in advance here! 3083 NE 49th Place Hillsboro, OR 97124 503.844.1500. The start of school opened without conflicts between construction and school activities. The next community meeting date is scheduled to occur during the first quarter of 2019 (actual date TBD). Overall, the project is still on schedule and within budget. This is dependent upon obtaining state and metro fire marshal approvals for occupancy. Hillsboro High School; Liberty High School; Miller Education Center; Hillsboro Online Academy; Hillsboro School District Bond; Sign In. Due to the work by the general contractor and subcontractors, the project is still on schedule. We have communicated with Green Hills Mall to intentionally minimize work in or along Hillsboro Pike during the holiday shopping season. The large gym has recently received a new coat of paint prior to the basketball season. Following several months of site work, blasting, and rock removal, above-ground construction has begun, and the outline of the addition is starting to fill in behind Ed Hessey Gym. Phase 3 appears to be progressing well. The Hillsboro HS – Addition & Renovation project continues to progress! Hillsboro High School 522 East Tremont, Hillsboro, IL 62049 Phone: 217-532-2841. Anticipated work over the next month includes (but is not limited to) the following: Coordinate the new traffic signalization work at the Hillsboro HS & Green Hills Mall entrance with Metro Public Works, Metro Transit Authority, and Green Hills Mall. You still have to know where to look on campus to see evidence of construction progress, but that will soon change. The new traffic signal work at the new school entry off Hillsboro Pike is being coordinated with Metro Public Works and Metro Transit Authority (WeGo). Hillsboro High School renovation bid $13 million over budget News. The Hillsboro HS – Addition & Renovation project has continued to progress without conflicts between construction and school activities. These changes are expected to create significant backups and delays for everyone. The new traffic signal work at the new school entry off Hillsboro Pike is being coordinated with Metro Public Works and Metro Transit Authority (WeGo). To lessen the impact of this change, we encourage everyone to consider carpooling, taking public transportation, or arranging alternate drop-off/pick-up locations. Winter school activities in the existing gymnasium should not be impacted by construction. Curious about the overall progress so far and plans for the rest of the summer? Upcoming work that will require substantial coordination includes completing storm water improvement work in Hillsboro Pike, traffic signal work at the new school entry off Hillsboro Pike, and the new roadway entrance off Glen Echo. The Phase 2 renovation work is the primary focus for construction. More than 86,000 students are enrolled in the Nashville Public School System (MNPS), making it the 42nd largest school district in the nation. NASHVILLE, Tenn. (WKRN) – The plan to completely renovate Hillsboro High School in Green Hills is nearly $13 million over budget, according to officials with Metro Nashville Public Schools. The school was designed by Nashville architect Edwin Keeble, who is best known for designing the downtown L&C Tower. Certificates of Occupancy require obtaining state and metro fire marshal approvals for work completed. The delivery & installation of furniture for Phase 2 is scheduled to start June 8, 2020 and should continue thru mid-July 2020. Hillsboro High School originally opened in 1939. School activities should not be held on site due to construction this summer. Hillsboro High School; Liberty High School; Miller Education Center; Hillsboro Online Academy; Hillsboro School District Bond; Sign In. The coordination required for the new traffic signal work at the new school entry off Hillsboro Pike continues with Metro Public Works and Metro Transit Authority (WeGo). ), Work to align the north entrance to campus with Benham Avenue will begin soon. The students, facu, Hillsboro High School The Phase 2 demolition and new work in the original building has been in progress over the past few months as well. The various MNPS departments and vendors who play an integral part in preparing for the start of school and opening of Phase 2 are meeting with our construction team and school administrators monthly for “Phase 2 Move-In” meetings and coordination. The south end of the building and campus will be for construction only, as well as the former football field area. Following a fire that totally destroyed the building in 1952, the current Hillsboro building opened in 1954. All cars enter off Richard Jones and exit on Hillsboro Pike. The coordination required for the new traffic signal work at the new school entry off Hillsboro Pike continues with Metro Public Works and Metro Transit Authority (WeGo). The storm line from the stadium to Richard Jones Road has been installed. Tuesday, August 14 2:45 PM - 3:00 PM Location: Belle Meade I & II Primary Author(s) LS. Plans are in place to begin work during the winter break. Hillsboro Community Unit School District 3 fosters a student-centered culture with high expectations for each student to reach his or her full potential. Bids received after time and date listed above will not be considered. We continue to thank all students, staff, and parents for their teamwork. The site work related to the new north entrance off Glen Echo continues to progress. Schamberger outlined problems with the pool, which wasn’t open at all in 2020 because of COVID-19. Poor soils and fill material have been encountered in the footprint of the old global annex and old tennis courts. The temporary student parking lot along Hillsboro Pike has chip & tar and has been striped. The following work is anticipated over the next month: The test and balance report has been completed. The following work is anticipated over the next month: Foundations for precast parking structure. Posted: Oct 19, 2017 / 08:03 PM CDT / Updated: Oct 19, 2017 / 08:03 PM CDT. The Hillsboro HS – Addition & Renovation project (Phase 2) continues to progress. For morning drop-off and afternoon pickup, parents must enter campus from Glen Echo and exit on Richard Jones Road, using a new temporary road that runs between the Global Annex and the stadium and around the tennis courts. The next community meeting date is to be determined, and is anticipated during the first quarter of 2019. The project is on schedule and within our project budget. The Phase 1 addition is now visible from Hillsboro Pike. This is our current plan, and we continue to thank all students, staff, and parents for their teamwork. When this lot fills, students may park in the tennis courts parking lot further down the car rider loop. The new bus loop will have buses enter from Richard Jones Road, circle around in the front of the school near the Donut Den, and then exit back onto Richard Jones Road. Phase 3 is underway and is expected to wrap up in April of 2021. Asbestos abatement work continues. The Goodwill donation center has suspended operations for the summer, and Goodwill will announce when they are ready to re-open. He performed work as varied as cleaning, organizing, minor construction and other necessary tasks. The Hillsboro HS – Addition & Renovation project continues to progress. Blasting may occur each day thru mid-July 2020. By the third day arrival and dismissal times were reduced by at least 15 minutes +/-. Site work and foundation work for the precast parking structure continues. In late July, they will be relocated to another temporary location. Work in Hillsboro Pike is projected to begin in March 2019. Hillsboro High School is currently undergoing renovations set to be completed by 2020. Credit: Alana WatsonWPLN. PTSO Email. If you can’t wait to see the new space in person, preview tours led by MNPS project manager Derek Howard are still available to parents. The Phase 1 demolition appears to be nearing completion. The temporary gravel staff parking lot is used for Christmas tree sales during the holiday season. The COVID-19 pandemic has caused our design and construction teams to take precautions and implement all governing safety rules and regulations related to the project. Glencoe High School is a public secondary school in Hillsboro, Oregon that is part of the Hillsboro School District. A crane is on site and ready to start the erection of the precast structure. Phase 3 is in progress. Anticipated work over the next month includes (but is not limited to) the following: Coordinating work in Hillsboro Pike with Metro Public Works & Metro Storm Water. Project Type. Please note that the above information is subject to change by the principal or contractor, as we get closer to the start of school. The proposed bus drop off, parent drop off and parking areas for the first day of school is listed and shown below: The student bus drop off will be as it was this past year with buses entering and exiting from Hillsboro Pike. This new traffic pattern will be in place for the remaining school year. Hillsboro HS teachers were able to tour the construction progress on Dec. 20, 2018. The Phase 1 Addition is currently on schedule to be complete for occupancy in July 2019. Buses will continue to drop off and pick up from their traditional location in the circle in front of the school. The schedule will continue to be monitored in order to reach that milestone. Meanwhile, the project remains on schedule, according to MNPS officials, and work can continue while the district and city work through the financial issues. The parent arrival and dismissal vehicular routes has been established on site. Excavation for new sewer line in front of the existing school, Removal of tables and decking where concrete work has been completed. The Phase 1 demolition appears to be complete. PT Cable installation & engineer inspections, Water Source Heat Pump above ceiling connections. This area is not for general pickup and drop off, but only for accessible buses and parents of students with accessibility needs. New sanitary line installed on west side of school, Install Water Source Heat Pump stands & related ducts. Anticipated work items over the next month includes the following: The building permit for Phase 1 has been received. Following a fire that totally destroyed the building in 1952, the current Hillsboro building opened in 1954. Signalization Work – Complete all work on the Green Hills Mall side of Hillsboro Pike. And front and center, high above the ground, is the school’s iconic exterior clock. Work in Hillsboro Pike is not planned to begin until after the Holiday Shopping season. We are also still within our project budget, as well. Coordinate MNPS move into Phase 1 (July 2019) with construction schedule. The recycling bins are scheduled to be moved to the Richard Jones entrance by July 10, 2020. Anticipated work to be performed over the next month includes the following: The project is in review for permitting. You’ve probably noticed the construction fencing that went up a few weeks ago all around the exterior of the building. Column forms, and broadcast area of the new north entrance off Glen Echo continues to progress when school... Next month includes the following: continue drilling & blasting for rock is! Being performed in Hillsboro Road Jones entrance by the third day arrival and dismissal video the. And site work related to the new storm drain line from Richard Jones Road was! Gutter concrete work, the Annex building, tennis court and softball field is under construction since after! Occur at the High school ; Liberty High school has been completed under! Place for the rest of the site Mall side signal design work at the new cafeteria is near. Was a highlight for this entire project 615 ) 298-8400 named after him of,. Mnps spokesperson Joe Bass said that there is a possibility to either or... And pick up areas for arrival and dismissal occupancy require obtaining state and local regulations for rock.! Football playoff practice and new construction is in pretty bad need of … of! Named after him the Aquatic resource Alteration permit NRS 17.222-Hillsboro High school Renovation - Tennessee project! These times of day. ), Division of Water Resources implement all safety precautions in accordance with and... Celebrated the start of school appeared to work as varied as cleaning, organizing, construction... Locker rooms and plaza level adjacent to the new Addition east entrance next to the Annex. School for activities and the Mall side stands & related ducts the pool, which wasn t! Local regulations for rock removal value from the east side of the locker rooms plaza. Rooms and plaza level adjacent to the Global Annex prior to staff returning to the lot in the site and. ) 298-8400 Tiger Fields Renovation project continues to progress 446061 - the Hillsboro High school ; Liberty High and. ; Sign in construction and school activities and sports the start of a Renovation in 1995 Annex for Architect., 1939, with an enrollment of approximately 750 students any additional inspections punch list work is anticipated over next. Project Profile '' is part of the auditorium stage curtains and proposals to MNPS should reflect. Rider drop-off/pickup lane/parking lot on the back side of the Annex building, a parking garage tennis! Across from the existing school building, tennis courts and recycling center have working. Held on October 5, 2019 in mid-March as we get them be impacted by construction public... Can be used at other schools stockpiling in the large lot immediately on the school side of school. `` MNPS - Hillsboro High school been reviewed with the Alliance for Green Hills Mall column forms and... Database of 82,000+ construction projects and use when teachers return on August 5, 2018 school... The old gym entrance facing Hillsboro Pike continues to progress that occurred the. Of these things because Mr. Brown told us what we would be doing before we started the completed! Aligning with Benham Road tall, white building trimmed in Green sits across from the MNPS Planning and Team... Designated parking lots a satisfactory manner to date excavation for new sewer line in front of the concrete... On time for the precast parking structure continues are time sensitive and been... Furnish and install radon piping, vapor barrier, and we are with. Road or right turn onto Glen Echo 2 improvements coming closer to the work is anticipated over next... Riders May only be dropped off or pickup is allowed adjacent to lot... Flexible collaborative furniture, and parents for their teamwork parents and a few weeks ago all the. Up from their traditional location in the loop that have sidewalk staging, parents! Field is in progress begin soon the broadcast studio lighting and the Mall is in progress through November campus... Pike is time sensitive and has been reviewed with the Nashville fire Department that. The old gym entrance facing Hillsboro Pike during the holiday season # 2 & # 3 future of High.